90% of construction activity takes place on the ground, including assembly and DC wiring. Workers are more efficient/safer since they are not working at height. Lightweight material enables construction on pre-cast garages when other traditional systems may exceed the garage’s loading capacity. Lower $/watt inverter cost when sizing for E/W array production curve. 15% higher density than long span south facing canopies.